Archive for May, 2014

Platon membranes replace failed waterproofing system in school

Monday, May 12th, 2014

Platon Membranes at St Michaels School

External waterproofing in the school hall at St Michael’s School in Jersey had failed at wall/floor and floor/floor joints, leading to severe water ingress. St Helier based Premier Contracting used waterproofing products from Triton to replace the previous failed system before the sports floor was reinstated. Read the full case study here:  Triton St Michael School Case Study

Triton featured in NBS National BIM Report!

Sunday, May 11th, 2014

Paul Sweatman

Triton’s Specification Manager, Paul Sweatman, has been featured in the fourth NBS National BIM Report.  The report looks at how UK building design professionals are adapting to the use of BIM. Results suggest we are now reaching a stage where BIM is becoming the norm. Paul was asked to comment on the importance of BIM from the point of view of a manufacturer. Triton’s products are available for download as BIM Objects from this website and the company was the first manufacturer in the waterproofing industry to offer BIM Objects to architects.

Essential reading for those adopting – or considering adopting – BIM, read or download the report here:  NBS-National-BIM-Report-2014